--- layout: default title: Configuration nav_order: 3 --- # Configuration ## Finding Your Heat Pump URL The integration requires the URL to your heat pump's status API. The format is typically: ``` http:///installedplugin/com.innova.pdc//server/index.php?Action=GetStatus ``` ### Method 1: Browser Developer Tools 1. Access your heat pump's web interface in a browser 2. Open browser developer tools (F12) 3. Navigate to the **Network** tab 4. Refresh the page or navigate the heat pump interface 5. Look for requests to `index.php?Action=GetStatus` 6. Copy the full URL ![Finding URL in DevTools](assets/images/devtools-network.png) *Use browser developer tools to find the correct API URL* ### Method 2: Common URL Patterns Try these common URL patterns (replace IP with your heat pump's IP): ``` http://192.168.1.100/installedplugin/com.innova.pdc/2.0.10/server/index.php?Action=GetStatus http://192.168.1.100/installedplugin/com.innova.pdc/3.0.49/server/index.php?Action=GetStatus ``` ### Verify Your URL Open the URL in a browser. You should see a JSON response like: ```json { "success": true, "sw": { "V": "3.0.49" }, "RESULT": { "status": { "watert1": 32.1, "watert2": 32.0, "heating": true, ... } } } ``` ![JSON Response](assets/images/json-response.png) *Expected JSON response when accessing the URL* ## Configuration Wizard ### Step 1: Enter URL When adding the integration, enter your heat pump URL: ![Enter URL](assets/images/config-url.png) *Enter the heat pump status URL* ### Step 2: Set Update Interval Optionally configure the update interval (default: 3 seconds): | Setting | Description | Recommended | |---------|-------------|-------------| | 1-2 seconds | Very frequent updates | High network load | | 3 seconds | Default, good balance | Recommended | | 5-10 seconds | Less frequent | Low network load | ![Update Interval](assets/images/config-interval.png) *Configure the polling interval* ### Step 3: Confirm Configuration Review and confirm your settings: ![Confirm Config](assets/images/config-confirm.png) *Review configuration before completing setup* ## Configuration Options After initial setup, you can modify options: 1. Go to **Settings** > **Devices & Services** 2. Find "Heat Pump Monitor" 3. Click **Configure** ![Reconfigure](assets/images/reconfigure.png) *Access configuration options after setup* ## Entity Customization After setup, you may want to customize entities: ### Rename Entities 1. Go to **Settings** > **Devices & Services** 2. Click on the Heat Pump device 3. Click on an entity 4. Change the name as desired ![Rename Entity](assets/images/rename-entity.png) *Customize entity names* ### Hide Unused Entities If some sensors don't apply to your setup: 1. Click on the entity 2. Toggle "Enable" off ## Next Steps - [Set up the dashboard](dashboard.md) - [Troubleshoot issues](troubleshooting.md)